SPECIALIZED IN CONCRETE
AND REFRACTORY APPLICATIONS

Concrete and refractory applications require maintenance, and Global Project Support (GPS) is specialized in various disciplines that can help you with this. Whether it’s the installation, reparation or demolition of concrete and refractory applications, we always offer our clients the best solution!

 

Are you still deciding if our techniques can benefit your project? As a highly specialized enterprise and consultant in this field, we are happy to tell you all about our solutions.

REPAIRS & APPLICATIONS

Whether it’s sprayed concrete, manual repairs, injection work, fireproofing or refractory applications, Global Project Support (GPS) always offer its clients the perfect set of solutions! Do you want to know if our repair techniques can benefit your project?

 

As a High-End enterprise and consultant in this field, we are happy to tell you all about our concrete repair solutions.

REPAIRS & APPLICATIONS

Whether it’s sprayed concrete, manual repairs, injection work, fireproofing or refractory applications, Global Project Support (GPS) always offer its clients the perfect set of solutions! 

 

Do you want to know if our repair techniques can benefit your project?

HYDRODEMOLITION

Hydrodemolition is a technique for the demolition of concrete structures without vibrations, without quartz dust and without the contact noise of pneumatic equipment. As pioneer and innovator in the field of hydrodemolition, Global Project Support (GPS) can carry out work that seemed impossible until recently.

 

With high pressure water jets, we remove the exact amount of concrete from the structure that is needed, without structural damage to the part that needs to remain intact. And without adverse effects to people and the environment. It is for good reason that the trade association recommends applying hydrodemolition.

 

Does hydrodemolition fit the requirements for your demolition project? We are happy to tell you all about our hydrodemolition solutions.

HYDRODEMOLITION

Hydrodemolition is a technique for the demolition of concrete structures without vibrations, without quartz dust and without the contact noise of pneumatic equipment. As pioneer and innovator in the field of hydrodemolition, Global Project Support (GPS) can carry out work that seemed impossible until recently.

 

With high pressure water jets, we remove the exact amount of concrete from the structure that is needed, without structural damage to the part that needs to remain intact. And without adverse effects to people and the environment. It is for good reason that the trade association recommends applying hydrodemolition.

 

 

Does hydrodemolition fit the requirements for your demolition project? We are happy to tell you all about our hydrodemolition solutions.

CASE ROULETTE

REFRACTORY INSTALLATION AFTERBURNER

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Civil engineering

Grout Removal

Three weeks

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Rohrdorfer Group, Austria

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Petrobrazi Refinery (Romania)

Civil engineering

Grout Removal

Three weeks

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Rohrdorfer Group, Austria

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Petrobrazi Refinery (Romania)

Civil engineering

Grout Removal

Three weeks