How do you install over 400 tonnes of refractory shotcrete material in a single layer and on a tight schedule?

One of VTG’s regular (international) clients was looking for a method to install over 400 tonnes of high-quality, refractory shotcrete material in as little time and with the highest quality possible. How did we fulfil this?
Our qualified employees used our shotcrete method, which allows us to spray large amounts of refractory shotcrete material with the guarantee of consistent quality.

These products are mixed to the right consistency beforehand and are pumped “wet” using an ultra-high-pressure piston pump. The required additives ensure the product can be sprayed and that is achieves a layer thickness of 300 mm1 in a single operation.

Want to know more?

Want to know more?

CASE PHOTOGRAPHS

CASE VIDEO

CASE ROULETTE

REFRACTORY INSTALLATION AFTERBURNER

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

BALLAST BLOCKS FOR NEW BRIDGES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Civil engineering

Grout Removal

Three weeks

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Petrobrazi Refinery (Romania)

Civil engineering

Grout Removal

Three weeks

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months

REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Petrobrazi Refinery (Romania)

Civil engineering

Grout Removal

Three weeks