REMOVAL OF REFRACTORY CONCRETE FROM HYDROCRACKER

Petrobrazi Refinery (Romania)

DURATION

SEGMENT

SOLUTION

Three weeks

Oil & gas refinery

Removing refractory concrete

How do you remove a refractory concrete cladding with a pressure strength of 190 N/mm2 from an installation with a diameter of 800 – 1000 millimetres?

 

Petrobrazi Refinery (Romania) was looking for a quick method to remove extremely hard refractory concrete from a hydrocracker. Until recently, this kind of demolition work was performed through manual scabbling: a deployment of four months of 24/7 continuous shifts in very difficult conditions. Specifically for Petrobrazi, ADS developed a revolutionary method that allowed us to get the same job done in just two weeks! This resulted in massive savings for the client. Not just in terms of man hours, but also in terms of the strongly reduced downtime of the installation.

How did we make the seemingly impossible possible? By linking multiple high-pressure units together, we were able to generate an enormous force that removed the concrete without damaging the steel pipes. Even the existing anchoring could be saved, so that the client was able to install new refractory concrete cladding without further pre-treatment. This unique application resulted in a patent for ADS.

Want to know more?

Andrei Pascu

Want to know more?

Andrei Pascu

CASE PHOTOGRAPHS

CASE VIDEO

CASE ROULETTE

REFRACTORY INSTALLATION AFTERBURNER

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

International contractors

Grout Removal

Five months

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Rohrdorfer Group, Austria

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months

REFRACTORY INSTALLATION AFTERBURNER

WASTE TERMINAL MOERDIJK

Heavy industries, International contractors

Shotcrete application and refractory gunning

Three months

REPAIR CONCRETE WITH LARGE PRECISION SEA LOCK IJMUIDEN

IJmuiden Sea Lock

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One year

REFRACTORY INSTALLATION AFTERBURNER

Waste Terminal Moerdijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

RENOVATING CHEMICAL COLLECTION CONTAINERS

Amsterdam

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CYCLONES

Holcim, Eclépens

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RENOVATION QUENCHING TOWER 21

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two years

ASSENDELFT, HVC ENERGY DISTRICT HEATING

Assendelft, HVC Energie

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

RAIL CONSTRUCTION RENOVATION

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

SHOTCRETE CEMENT PLANT

Rohrdorfer Group, Austria

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One month

BALLAST BLOCKS FOR NEW BRIDGES

Port of Antwerp

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

2 days

REMOVAL OF BRIDGE DECK LANGE WETERING

Lange Wetering

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Five weeks

REMOVAL OF 600 MM1 REINFORCED STRUCTURE SEA LOCK IJMUIDEN

Sea lock Ijmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

One week

REMOVING CONCRETE AROUND TENSION BARS AT PLATFORM SCHIPHOL

Schiphol

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Multiple phases

REMOVAL OF TAR EPOXY FROM STEEL ECK TACITUS BRIDGE RIJKSWEG A50 EWIJK

The Waal Bridge at Ewijk

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three months

REMOVAL OF EXISTING GROUTING AT HEIGHT

Tata Steel IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

REMOVAL OF PRESSURE LAYER ON T-BEAMS

Heavy industry

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Two weeks

REMOVAL OF 40 MM OF CONCRETE WITH EXTREME PRECISION

new sea lock at IJmuiden

Nuclear power plants, International contractors, Oil & gas refinery, Heavy industries, Offshore, Civil engineering

Rebar saving demolition, High pressure cutting technique (hydro-cutting), Removing refractory concrete, Cleaning or pre-treating concrete, Treating waste water, Grout Removal

Three weeks

DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

PORT OF ANTWERP

International contractors, Civil engineering

Rebar saving demolition

One week

REMOVAL OF GROUT AT A DEPTH OF 40 METRES

OVERCOME TECHNICAL HYDRODEMOLITION CHALLENGES

International contractors

Grout Removal

Five months